CSA: Civilian Space Administration

PHASE I

  • Marketing
  • Funding
  • Probe Launcher Design Schematics
  • Magnetic Current Research
  • Logo Trademark Copyrights Pending
  • Licenses
  • Pending Patent for PPD's
  • Probe Design Schematics
  • Launch Control Center Design Schematics
  • Moon Base Design Schematics

PHASE II

  • Launch Control Center Location
  • Control Center Construction
  • Probe Launcher Construction

PHASE III

  • New Construction Testing
  • Satellite Launches
  • Probe Launches
  • Moon Base Design
  • Moon Launch Preperations

PHASE IV

  • Moon Probe Testing
  • Moon Mining
  • Moon Base Construction
  • Starship Design
  • Starship Preperations

PHASE V

  • Our first active Starship
  • Gleis 151

PHASE I ACTIVE

We are currently in Phase I of the 5 phase plan to meet our long term goal of having an active starship in space.

Obviously there will be a lot that needs to be done within each of the 5 phases. This break down of the 5 phases is simply an outline to get everyone pointed in the right direction.

Again the concept is to bring everyone from around the world together in a united effort to get into space and beyond at a much more accelerated rate without having any government control on it.

A lot of research and testing needs to be done by all, be they hobby-ists to science professors to engineers to even those that just have a dream to reach the stars. Oh, and yes even backyard enthusiasts are welcome.

Wouldn't it be nice to have any and all developed technology made available to everyone in the world? If UFO's and Aliens exist and contact is made with them, wouldn't it be nice to simply know the truth?

Well that is what the CSA is all about, and you can become a part of it today!

 

Placeholder
Placeholder
stats

Hosted by T35 Free Web Hosting. Sunglasses Sale - Casino Review - Audi Los Angeles - Drug Rehab - Online Degree - Web Hosting - Prada - SEO Services